Skip to main content

SB 862 — Virginia

Electric utilities; construction of certain transmission lines; grid-enhancing technologies.

Introduced 2027 session Senate

History

  1. Introduced, completed
  2. Passed Senate, in progress
  3. Passed House of Delegates, not reached yet
  4. Sent to Governor, not reached yet
  5. Signed into law, not reached yet

Jump to the full bill timeline

This page lists STATE bills only. Open States, our source for this data, tracks state legislatures -- it has no visibility into city councils, county commissions or school boards. We don't yet have a free, storable source for local measures; see the About page for why.

Summary

Electric utilities; construction of certain transmission lines; grid-enhancing technologies. Provides that any application for the construction of an electrical transmission line of 138 kilovolts or more shall include an explanation of why the need for such line cannot instead be met through the use of grid-enhancing technologies, as defined in existing law, within existing electrical transmission corridors or routes.

Official abstract, as published by the legislature.

  • SB 862 is a bill in the Virginia Senate, 2027 session, introduced November 19, 2026.
  • Sponsored by Russet Perry.
  • Current status: introduced.
  • Most recent action (November 19, 2026): Referred to Committee on Commerce and Labor.

Sponsors

Primary sponsor

  • Primary sponsor

    Russet Perry

    State Senator, District 31
    Democratic

Contact your legislator about this bill

Bill text & documents

Bill timeline

  1. Senate Prefiled and ordered printed; Offered 01-13-2027 27100517D Milestone
  2. Senate Referred to Committee on Commerce and Labor Latest

Source: Open States. Last checked November 23, 2026. How we keep this accurate ›