California legislative agenda & upcoming votes California session calendar
Summary
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, on or before March 31, 2024, to evaluate each customer renewable energy subscription program to determine if the program meets specified goals and to determine whether it would be beneficial to ratepayers to establish a new tariff or program for an electrical corporation, or modify an existing tariff or program administered by an electrical corporation, to establish a community renewable energy program, as provided. If the PUC determines that it would be beneficial to ratepayers to establish the community renewable energy program, existing law requires the PUC, on or before July 1, 2024, to establish the program and require each electrical corporation to participate in the program.
This bill would revise the requirements of the customer renewable energy subscription program, as provided, among other things, to promote participation by low-income customers at levels commensurate with the opportunity provided to certain customer-generators, to provide bill credits to subscribers based on the avoided costs of community renewable energy generators, as defined, participating in the program if the community renewable energy generator is determined to be a load-modifying resource, to require all community renewable energy generators participating in the program to have no more than 5 megawatts of generation capacity and no more than 5 megawatts of energy storage, and to limit the total program capacity to 4 gigawatts or end the enrollment of new community renewable energy generators in the program after 7 years, whichever occurs first. The bill would require the State Energy Resources Conservation and Development Commission (Energy Commission) , in a public process that includes opportunity for public comment, to evaluate the load-modifying potential of community renewable energy generators, as specified, and, if the evaluation finds that community renewable energy generators have load-modifying potential, to, on or before December 1, 2027, in a public process with opportunity for public comment, identify attributes that the Energy Commission would expect a community renewable energy generator to meet in order to be classified by the PUC as a load-modifying resource, as provided. The bill would require the PUC, within 180 days following the identification of attributes by the Energy Commission, to adopt or modify a customer renewable energy subscription program consistent with the revisions to the program made by the bill, and would require the PUC to establish in the program a mechanism to determine whether community renewable energy generators are load-modifying resources, as provided.
Existing law requires the PUC, within 24 months of establishing a community renewable energy program and annually thereafter for the duration of the program, to submit to the Legislature a report on the facilities deployed and customers subscribed, as provided.
This bill would instead require the PUC, within 24 months of the adoption or modification of a customer renewable energy subscription program and annually thereafter for the duration of the program, to submit to the Legislature a report on the community renewable energy generators participating in the program and customers subscribed. The bill would repeal this requirement on January 1, 2034.
Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because a violation of a PUC action implementing this bill's requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
- AB 1813 is a bill in the California Assembly, 20252026 session, introduced February 10, 2026.
- Current status: vetoed.
- Most recent action (September 30, 2026): Vetoed by Governor.
- 8 recorded votes; the most recent, on August 31, 2026, passed 52-12.
- Subjects: Electricity, customerrenewableenergysubscriptionprogram.
Contact your legislator about this bill
Bill text & documents
- AB1813 (opens in a new tab)
- 02/10/26 - Introduced (opens in a new tab)
- 03/19/26 - Amended Assembly (opens in a new tab)
- 04/27/26 - Amended Assembly (opens in a new tab)
- 06/18/26 - Amended Senate (opens in a new tab)
- 08/27/26 - Amended Senate (opens in a new tab)
- 09/04/26 - Enrolled (opens in a new tab)
- 04/21/26- Assembly Committee on Utilities and Energy (opens in a new tab)
- 05/05/26- Assembly Appropriations (opens in a new tab)
- 05/20/26- ASSEMBLY FLOOR ANALYSIS (opens in a new tab)
- 06/15/26- Senate Energy, Utilities and Communications (opens in a new tab)
- 06/26/26- Senate Appropriations (opens in a new tab)
- 08/14/26- Sen. Floor Analyses (opens in a new tab)
- 08/28/26- Sen. Floor Analyses (opens in a new tab)
- 08/30/26- ASSEMBLY FLOOR ANALYSIS (opens in a new tab)
- 10/13/26- ASSEMBLY FLOOR ANALYSIS (opens in a new tab)
- This bill on Open States (opens in a new tab)
Sponsors
History
- Introduced, completed
- Passed Assembly, completed
- Passed Senate, completed
- Sent to Governor, completed
- Vetoed, completed, current stage
- Assembly Read first time. To print.
- Assembly From printer. May be heard in committee March 13.
- Assembly Referred to Com. on U. & E.
- Assembly From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended.
- Assembly Re-referred to Com. on U. & E.
- Assembly In committee: Set, first hearing. Hearing canceled at the request of author.
-
Assembly
Do pass as amended and be re-referred to the Committee on [Appropriations]
12 yes 0 no, 6 other Passed, 100% yes
- Assembly From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 12. Noes 0.) (April 22).
- Assembly Read second time and amended.
- Assembly Re-referred to Com. on APPR.
- Assembly In committee: Set, first hearing. Referred to APPR. suspense file.
-
Assembly
From committee: Do pass. (Ayes 10. Noes 2.) (May 14).
Do pass.: 10 yes 2 no, 3 other Passed, 83% yes
- Assembly Read second time. Ordered to third reading.
-
Assembly
Read third time. Passed. Ordered to the Senate. (Ayes 51. Noes 8. Page 5258.)
Milestone
AB 1813 Ward Assembly Third Reading: 51 yes 8 no, 21 other Passed, 86% yes
- Senate In Senate. Read first time. To Com. on RLS. for assignment.
- Senate Referred to Com. on E., U & C.
-
Senate
Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations]
11 yes 2 no, 4 other Passed, 85% yes
- Senate From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 11. Noes 2.) (June 16).
- Senate Read second time and amended. Re-referred to Com. on APPR.
-
Senate
In committee: Referred to APPR. suspense file.
Placed on suspense file: 7 yes 0 no Passed, 100% yes
-
Senate
From committee: Do pass. (Ayes 5. Noes 2.) (August 13).
Do pass: 5 yes 2 no Passed, 71% yes
- Senate Read second time. Ordered to third reading.
- Senate Read third time and amended. Ordered to second reading.
- Senate Read second time. Ordered to third reading.
-
Senate
Read third time. Passed. Ordered to the Assembly. (Ayes 30. Noes 10.).
Milestone
3rd Reading AB1813 Ward et al. By Caballero: 30 yes 10 no Passed, 75% yes
- Assembly In Assembly. Concurrence in Senate amendments pending.
-
Assembly
Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 52. Noes 12. Page 6964.).
AB 1813 Ward Concurrence in Senate Amendments: 52 yes 12 no, 15 other Passed, 81% yes
- Legislature Enrolled and presented to the Governor at 1:30 p.m.
- Assembly Vetoed by Governor. Milestone Latest