Electrical corporations: rates: smart meter infrastructure: dynamic rate option.

Passed one chamber 20252026 session Assembly

History

  1. Introduced, completed
  2. Passed Assembly, completed
  3. Passed Senate, in progress
  4. Sent to Governor, not reached yet
  5. Signed into law, not reached yet

Jump to the full bill timeline

This page lists STATE bills only. Open States, our source for this data, tracks state legislatures -- it has no visibility into city councils, county commissions or school boards. We don't yet have a free, storable source for local measures; see the About page for why.

Summary

Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. Existing law requires each electrical corporation to identify a separate rate component to fund certain programs that enhance system reliability and provide in-state benefits. Existing law requires that the rate component be a nonbypassable element of the local distribution service.

This bill would require the commission to require a large electrical corporation, if the commission approves the large electrical corporation's request to upgrade its smart meter infrastructure relative to infrastructure in place on January 1, 2026, to offer eligible customer segments at least one dynamic rate option no later than 18 months after the upgraded smart meter infrastructure is anticipated to be placed into service, as specified. The bill would require the commission to ensure, in reviewing a request of a large electrical corporation to recover costs associated with upgrading its smart meter infrastructure, that specified conditions are met. The bill would also require the commission to ensure, among other things, the large electrical corporation makes the same time-varying distribution rates available to both bundled customers and unbundled customers located in the same geographic area, as specified.

Under existing law, a violation of the Public Utilities Act or an order, decision, rule, direction, demand, or requirement of the commission is a crime.

Because the above provisions would be part of the act and a violation of a commission action implementing this bill's requirements would be a crime, the bill would impose a state-mandated local program.

The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.

This bill would provide that no reimbursement is required by this act for a specified reason.

Official abstract, as published by the legislature.

  • AB 1787 is a bill in the California Assembly, 20252026 session, introduced February 10, 2026.
  • Current status: passed one chamber.
  • Most recent action (August 13, 2026): In committee: Held under submission.
  • 5 recorded votes; the most recent, on August 3, 2026, passed 7-0.
  • Subjects: Electricalcorporations, dynamicrateoption, rates, smartmeterinfrastructure.

Sponsors

Cosponsors (5)

  • Cosponsor

    Nick Schultz

    State Representative, District 44
    Democratic

  • Cosponsor

    Jacqui Irwin

    State Representative, District 42
    Democratic

  • Cosponsor

    Cottie Petrie-Norris

    State Representative, District 73
    Democratic

  • Cosponsor

    Chris Rogers

    State Representative, District 2
    Democratic

  • Cosponsor

    Henry Stern

    State Senator, District 27
    Democratic

Contact your legislator about this bill

Bill text & documents

Bill timeline

  1. Assembly Read first time. To print.
  2. Assembly From printer. May be heard in committee March 13.
  3. Assembly Referred to Com. on U. & E.
  4. Assembly From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended.
  5. Assembly Re-referred to Com. on U. & E.
  6. Assembly From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 13. Noes 0.) (March 18).

    Do pass as amended and be re-referred to the Committee on [Appropriations]: 13 yes 0 no, 5 other Passed, 100% yes

  7. Assembly Read second time and amended.
  8. Assembly Re-referred to Com. on APPR.
  9. Assembly In committee: Set, first hearing. Referred to APPR. suspense file.
  10. Assembly From committee: Do pass. (Ayes 11. Noes 0.) (May 14).

    Do pass.: 11 yes 0 no, 4 other Passed, 100% yes

  11. Assembly Read second time. Ordered to third reading.
  12. Assembly Read third time and amended. Ordered to third reading. (Page 5152.)
  13. Assembly Read third time. Passed. Ordered to the Senate. (Ayes 57. Noes 6. Page 5298.) Milestone

    AB 1787 Schultz Assembly Third Reading: 57 yes 6 no, 17 other Passed, 90% yes

  14. Senate In Senate. Read first time. To Com. on RLS. for assignment.
  15. Senate Referred to Com. on E., U & C.
  16. Senate From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on E., U & C.
  17. Senate In committee: Set, first hearing. Hearing canceled at the request of author.
  18. Senate Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations]

    12 yes 4 no, 1 other Passed, 75% yes

  19. Senate From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 12. Noes 4.) (June 30).
  20. Senate Read second time and amended. Re-referred to Com. on APPR.
  21. Senate In committee: Referred to APPR. suspense file.

    Placed on suspense file: 7 yes 0 no Passed, 100% yes

  22. Senate In committee: Held under submission. Latest

Source: Open States. Last checked November 17, 2026. How we keep this accurate ›