AB 1104 — California
Net energy metering: construction of renewable electrical generation facilities: public works project requirements.
California legislative agenda & upcoming votes California session calendar
Summary
(1) Existing law requires each electrical utility or other entity that offers electrical service, except as specified, to develop a standard contract or tariff that provides for net energy metering (NEM) , that, among other things, compensates each eligible customer-generator, as defined, for the electricity it generated, as provided. Existing law requires each electrical utility to make the contract or tariff, commonly known as NEM 1.0, available to eligible customer-generators, upon request, as specified. Existing law requires the Public Utilities Commission to develop an additional standard contract or tariff, and requires each large electrical corporation to offer that standard contract or tariff, commonly known as NEM 2.0, to its eligible customer-generators, as provided. Existing law authorizes the commission to revise the standard contract or tariff, as specified. Pursuant to its authority, the commission adopted Decision 22-12-056 (December 19, 2022) , commonly known as the net billing tariff, which creates a successor tariff to NEM 1.0 and NEM 2.0 and includes specified elements.
Existing law requires that, except as specified, not less than the general prevailing rate of per diem wages, determined by the Director of Industrial Relations, be paid to workers employed on public works projects. Existing law defines "public works" for purposes of requirements regarding the payment of prevailing wages to include construction, alteration, demolition, installation, or repair work done under contract and paid for using public funds, except as specified. Existing law requires the awarding body, as defined, of a contract for public work to do specified things, including to withhold and retain all amounts required to satisfy any civil wage and penalty assessments issued by the Labor Commissioner from payments made to the contractor, as specified. Existing law requires an awarding body to provide notice, containing certain information, to the Department of Industrial Relations of any public works contract subject to the public works requirements, within 30 days of the award, as provided. Existing law constitutes, beginning December 31, 2023, the construction of any renewable electrical generation facility and any associated battery storage that receives service pursuant to NEM 1.0, NEM 2.0, or the net billing tariff, except as specified, as a public works project.
This bill would specify that an entity that engaged a contractor for construction of a renewable electrical generation facility and associated battery storage, as described above, is not an awarding body and that certain public works project requirements do not apply to that entity. The bill would also specify that the contractor who enters into a contract with that entity for those construction services is the awarding body only for purposes of the above-described requirement to provide notice to the Department of Industrial Relations.
Existing law provides for various enforcement mechanisms related to ensuring a contractor pays each construction worker the prevailing rate of per diem wages, and provides that enforcement of a willful violation of any of these mechanisms against a contractor for the construction of a renewable electrical generation facility disqualifies that facility from being eligible to receive service pursuant to NEM 1.0, NEM 2.0, or the net billing tariff.
This bill instead would specify that a renewable electrical generation facility remains eligible to receive service pursuant to NEM 1.0, NEM 2.0, or the net billing tariff despite enforcement of a willful violation against a contractor for the construction of the facility, as described above, if restitution has been made to the affected workers and all associated penalties and fines have been paid.
(2) Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the above-described provisions of this bill would be a part of the act and a violation of a commission action implementing the bill's requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
- AB 1104 is a bill in the California Assembly, 20252026 session, introduced February 20, 2025.
- Current status: signed into law.
- Most recent action (October 11, 2025): Chaptered by Secretary of State - Chapter 632, Statutes of 2025.
- 8 recorded votes; the most recent, on September 11, 2025, passed 79-0.
- Subjects: Netenergymetering, constructionofrenewableelectricalgenerationfacilities, publicworksprojectrequirements.
Contact your legislator about this bill
Bill text & documents
- AB1104 (opens in a new tab)
- 02/20/25 - Introduced (opens in a new tab)
- 03/25/25 - Amended Assembly (opens in a new tab)
- 04/21/25 - Amended Assembly (opens in a new tab)
- 05/05/25 - Amended Assembly (opens in a new tab)
- 09/05/25 - Amended Senate (opens in a new tab)
- 09/12/25 - Enrolled (opens in a new tab)
- 10/11/25 - Chaptered (opens in a new tab)
- 04/21/25- Assembly Labor and Employment (opens in a new tab)
- 04/29/25- Assembly Committee on Utilities and Energy (opens in a new tab)
- 05/19/25- Assembly Appropriations (opens in a new tab)
- 06/10/25- Senate Committee on Labor, Public Employment and Retirement (opens in a new tab)
- 07/03/25- Senate Energy, Utilities and Communications (opens in a new tab)
- 08/25/25- Sen. Floor Analyses (opens in a new tab)
- 09/08/25- Sen. Floor Analyses (opens in a new tab)
- 09/10/25- ASSEMBLY FLOOR ANALYSIS (opens in a new tab)
- This bill on Open States (opens in a new tab)
Sponsors
Cosponsors (1): Pellerin
History
- Introduced, completed
- Passed Assembly, completed
- Passed Senate, completed
- Sent to Governor, completed
- Signed into law, completed, current stage
- Assembly Read first time. To print.
- Assembly From printer. May be heard in committee March 23.
- Assembly Referred to Coms. on U. & E. and L. & E.
- Assembly From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended.
- Assembly Re-referred to Com. on U. & E.
- Assembly Re-referred to Coms. on L. & E. and U. & E. pursuant to Assembly Rule 96.
- Assembly From committee chair, with author's amendments: Amend, and re-refer to Com. on L. & E. Read second time and amended.
- Assembly Re-referred to Com. on L. & E.
-
Assembly
Do pass and be re-referred to the Committee on [Utilities and Energy]
6 yes 0 no, 1 other Passed, 100% yes
- Assembly From committee: Do pass and re-refer to Com. on U. & E. (Ayes 6. Noes 0.) (April 23). Re-referred to Com. on U. & E.
-
Assembly
In committee: Hearing postponed by committee.
Do pass as amended, and be re-referred to the Committee on [Appropriations] with recommendation: To Consent Calendar: 18 yes 0 no Passed, 100% yes
- Assembly From committee: Amend, and do pass as amended and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 18. Noes 0.) (April 30).
- Assembly Read second time and amended.
- Assembly Re-referred to Com. on APPR.
- Assembly In committee: Hearing postponed by committee.
-
Assembly
From committee: Do pass. To Consent Calendar. (Ayes 15. Noes 0.) (May 21).
Do pass. To Consent Calendar.: 15 yes 0 no Passed, 100% yes
- Assembly Read second time. Ordered to Consent Calendar.
-
Assembly
Read third time. Passed. Ordered to the Senate. (Ayes 76. Noes 0. Page 1740.)
Milestone
AB 1104 Pellerin Consent Calendar Second Day: 76 yes 0 no, 3 other Passed, 100% yes
- Senate In Senate. Read first time. To Com. on RLS. for assignment.
- Senate Referred to Coms. on L., P.E. & R. and E., U & C.
-
Senate
From committee: Do pass and re-refer to Com. on E., U & C. (Ayes 5. Noes 0.) (June 11). Re-referred to Com. on E., U & C.
Do pass, but first be re-referred to the Committee on [Energy, Utilities and Communications]: 5 yes 0 no Passed, 100% yes
-
Senate
Do pass, but first be re-referred to the Committee on [Appropriations] with the recommendation: To Consent Calendar
16 yes 0 no, 1 other Passed, 100% yes
- Senate From committee: Do pass and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 16. Noes 0.) (July 7). Re-referred to Com. on APPR.
- Senate From committee: Be ordered to second reading file pursuant to Senate Rule 28.8 and ordered to Consent Calendar.
- Senate Read second time. Ordered to Consent Calendar.
- Senate From Consent Calendar.
- Senate Ordered to third reading.
- Senate Read third time and amended. Ordered to second reading.
- Senate Read second time. Ordered to third reading.
-
Senate
Read third time. Passed. Ordered to the Assembly. (Ayes 40. Noes 0. Page 2676.).
Milestone
3rd Reading AB1104 Pellerin By Becker: 40 yes 0 no Passed, 100% yes
- Assembly In Assembly. Concurrence in Senate amendments pending.
- Assembly Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 79. Noes 0. Page 3231.).
-
Assembly
AB 1104 Pellerin Concurrence in Senate Amendments
79 yes 0 no, 1 other Passed, 100% yes
- Legislature Enrolled and presented to the Governor at 3 p.m.
- Legislature Approved by the Governor. Milestone
- Legislature Chaptered by Secretary of State - Chapter 632, Statutes of 2025. Milestone Latest