State bills: Wyoming · Energy
What's moving in state legislatures -- introductions, committee action, floor votes and sponsors.
Filter bills
-
27LSO-0181 — Wyoming
Utilities-electricity service exemptions.
-
27LSO-0019 — Wyoming
Enhanced oil recovery severance tax exemption-reporting.
-
27LSO-0024 — Wyoming
Energy transmission loan program.
-
27LSO-0060 — Wyoming
Nonpublic utility generators.
-
27LSO-0112 — Wyoming
Electricity from solar and nuclear resources-taxation.
-
27LSO-0022 — Wyoming
Regulation of produced water for oil and gas purposes.
-
27LSO-0082 — Wyoming
Penalty for violation of federal pipeline safety act.
-
27LSO-0023 — Wyoming
Utilities-regulation exception for electricity generators.
-
SF 123 — Wyoming
Wyoming energy dominance fund.
This act creates the Wyoming Energy Dominance Fund. Funds within the Wyoming Energy Dominance Fund are appropriated to the Wyoming Energy Authority to provide grants and loans for energy-related applied research, demonstration, pilot projects and commercial development projects. This act requires an application process to apply for a grant or loan and the Attorney General is required to provide an opinion regarding the legality of the grant or loan. The Wyoming Energy Authority is required to notify the Management Council and the Joint Minerals, Business and Economic Development Interim Committee of all proposed expenditures from the fund. The Management Council may make recommendations on the proposed expenditures. This act authorizes the transfer of funds to provide funding for the Wyoming Energy Dominance Fund. This act has a sunset date of December 31, 2028. Comments: Requires a report.
-
SF 99 — Wyoming
Prescriptive easements for electricity delivery.
This act authorizes a nonexclusive easement for electric utilities for a delivery system (the physical structures and power lines that convey electricity) if all of the following have been met:The electric utility has installed a delivery system.The delivery system is visibly installed so as to provide successors-in-interest constructive or actual notice that the delivery system exists on the property.The delivery system was installed on or before January 1, 2026.The delivery system's use is continuous and uninterrupted (for purposes of this requirement, an interruption must exceed one (1) year to be not continuous). The act provides that, upon the establishment of an easement for the electric utility, the electric utility has the right to reconstruct, re-phase, maintain and repair the existing system and to remove trees and vegetation likely to become hazardous to the system. Access to the easement granted under this act is limited to that access necessary to exercise the rights and privileges granted under this act, except that further access is authorized if access to the easement would be hazardous or materially encumbered. The act provides that the easement cannot exceed thirty (30) feet from any direction from the location of the physical parts of the system, and an easement is deemed abandoned if the electric utility fails to use the delivery system for more than three (3) consecutive years without an agreement with the landowner. Before the electric utility is granted an easement, the utility must publish a notice in a local newspaper or customer newsletter.
-
SF 70 — Wyoming
Omnibus water bill-construction.
2026 Construction ProjectsAlpine Well #4 Transmission Pipeline 2026Cloud Seeding: Wind River and Sierra Madre mountain ranges 2027 (ground‑based)Gillette Red Hills Tank 2026LaGrange Well Connection 2026Little Snake River Battle Lake Modification and Forest Management Demonstration Project 2026Small Water Development Projects – New Development 2026 2026 Rehabilitation ProjectsBig Horn Canal ID Five Mile Pipeline 2026Cody Canal ID Lead Diversion Rehabilitation 2026Cowley Transmission Pipeline Replacement 2026Deaver ID Rehabilitation Phase II 2026Elk Water Users ID Roan Wash Spill Rehabilitation 2026Glenrock Transmission Pipeline 2026GID 3.6 East Springer Pipeline Project 2026GID 29.4 Pipeline Project Phase III 2026Greybull Tank and Phase I Pipeline 2026Greybull Valley ID Upper Sunshine Outlet Works 2026Newcastle Transmission Pipeline 2026Owl Creek Re-Lift Pump Station and Dempsey Diversion 2026Powder River ID Fifteen Mile Siphon 2026Riverton West Main Street Transmission Pipeline 2026Shoshoni Well #6 and Transmission Pipeline 2026Sidon ID Byron Lateral 2026Small Water Development Projects – Rehabilitation 2026Tillard Canal Rehabilitation and Pump Station 2026 Amendments to Prior ProjectsEthete Water SupplyArapahoe Pipeline and TankArapahoe Water Supply 2016Broken Wheel Ranch Water Supply 2017Alkali Creek ReservoirMelody Ranch Water System Improvements 2018Austin-Wall Reservoir Rehabilitation 2019Interstate Diversion Structure Rehabilitation 2019Interstate Irrigation and Reservoir Irrigation District Improvements 2021Hoback Junction Public Water System 2025 Authorizing a transfer of funds from water development account I to water development account II. Authorizing a transfer of funds from water development account II to water development account I. Providing for the transfer of the test well Sheep Mountain No. 2 to the city of Douglas. Providing for a study to quantify how forest management treatments under the Little Snake River Battle Lake Modification and Forest Management Demonstration Project 2026 affect evapotranspiration and potential water yield. Providing for a study of the small water project program by the Wyoming Water Development Office. Comments: Requires a report on the study of forest management treatments to the Select Water Committee not later than November 1, 2030. Requires a report on the study of the Small Water Project Program to the Select Water Committee not later than November 1, 2026.
-
SF 102 — Wyoming
Wyoming energy transmission study.
This act requires the Wyoming Energy Authority to complete a transmission planning study concerning Wyoming's transmission system and the potential growth of that system. The act requires the Energy Authority to complete the study in two (2) phases. Phase one (1) must analyze the impacts of three potential load-growth scenarios on Wyoming's current system, including a model of Wyoming's transmission needs and the consideration of advanced transmission technologies and electricity storage to meet the need for expanded transmission. Phase two (2) requires the Energy Authority to develop a qualitative summary of Wyoming public utilities' participation, if any, in regional transmission organizations. The act requires the Wyoming Energy Authority to report twice to the Joint Corporations, Elections, and Political Subdivisions Interim Committee and the Joint Minerals, Business, and Economic Development Interim Committee on the results of each phase of the study. The act requires the Energy Authority to establish an advisory working group to provide input on the required study. The working group must be comprised of, at a minimum, the Public Service Commission, the Office of Consumer Advocate, and representatives from investor-owned public utilities, municipal utilities, and rural electric cooperatives. Comments: This act is effective immediately. This act requires two (2) reports from the Wyoming Energy Authority to the Joint Corporations, Elections, and Political Subdivisions Interim Committee and the Joint Minerals, Business, and Economic Development Interim Committee. The first report (for phase one (1) of the study) is due by November 1, 2027; the second report (for phase two) is due by September 1, 2028.
-
SF 91 — Wyoming
Wyoming energy project accountability act.
AN ACT relating to the administration of the government; providing requirements for energy projects; requiring legislative approval for specified energy projects; providing definitions; providing for exceptions; making conforming amendments; requiring rulemaking; specifying applicability; and providing for an effective date.
-
SF 76 — Wyoming
Distribution of taxes on large electrical loads.
AN ACT relating to sales tax; specifying the distribution of taxes on sales of very large electrical loads; providing a definition; providing reporting requirements; specifying applicability; and providing for an effective date.
-
SF 3 — Wyoming
Protection of nuclear facilities.
AN ACT relating to crimes and offenses; providing an affirmative defense for the use of defensive force for the protection or defense of nuclear facilities; providing definitions; establishing an offense of trespass on commercial nuclear facilities; specifying penalties; providing armed nuclear facility security guards the authority to detain persons as specified; and providing for an effective date.