AB 2182 — California
Energy efficiency: financing options: custom agricultural and industrial efficiency projects.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission) to establish a regulatory proceeding to develop and implement a comprehensive program to achieve greater energy savings in California's existing residential and nonresidential building stock. Existing law requires the PUC to investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purpose of implementing the program developed by the Energy Commission. Existing law imposes requirements for custom projects and other custom programs for industrial, agricultural, commercial, residential, and public sector customers. Existing law requires the PUC to develop and maintain rules for custom energy efficiency projects that include eligibility criteria or metrics for determining if a project is eligible for funding. This bill would delete the requirement on the PUC to develop and maintain those rules, and would instead require the commission, as part of the approval of the next Tier 2 advice letters submitted after January 1, 2027, by program administrators for mid-cycle review pursuant to a specific commission decision, to revise the rules adopted for custom agricultural and industrial efficiency projects to replace the commission's ex ante review process with a process that ensures the provision of incentives pursuant to these provisions for custom agricultural and industrial efficiency projects, as specified. Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the PUC is a crime. Because a violation of a PUC action implementing this bill's requirements would be a crime, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
-
AB 2410 — California
Wildfire safety: fuels reduction projects: California Environmental Quality Act.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. CEQA exempts from its requirements certain projects. This bill would, until January 1, 2030, exempt from CEQA critical fuels reduction projects that address extremely flammable species, are conducted in communities located in high fire threat districts or very high fire hazard severity zones, and remove specified nonnative species or common species. The bill would require projects exempt from CEQA pursuant to this exemption to comply with the best management practices under the 2025 Statewide Fuels Reduction Environmental Protection Plan, as provided. The bill would require a lead agency carrying out a project exempt from CEQA pursuant to this exemption to consult with the Department of Fish and Wildlife, as provided, and to, within 90 days of project completion, submit a notice of project completion and a final compliance determination regarding the 2025 Statewide Fuels Reduction Environmental Protection Plan to the Secretary of the Natural Resources Agency and the Secretary for Environmental Protection, as provided. The bill would require, on or before March 1, 2028, and annually thereafter, the Secretary of the Natural Resources Agency to, in consultation with the Secretary for Environmental Protection, submit a report to the Legislature with specified information summarizing the implementation of these provisions during the preceding calendar year. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
-
HB 268 — North Carolina
2026 Budget Technical Corrections - II.
-
SB 445 — North Carolina
Regulatory Reform Act of 2026.
-
AB 168 — California
Public Resources.
Existing law establishes the State Energy Resources Conservation and Development Commission (Energy Commission) , consisting of 5 members appointed by the Governor. Existing law requires the Governor to designate one of those members as the chair and another member as the vice chair. Existing law establishes an annual salary for the commission members and a higher annual salary for the chairperson, as prescribed. This bill would require the vice chair of the Energy Commission, operative July 1, 2027, to receive an annual salary that is at the midpoint between the annual salary of the other commission members and that of the chairperson. Existing law establishes the California membership of the board of directors of the Western Climate Initiative, Incorporated (WCI, Inc.) as part of the state's implementations of the California Global Warming Solutions Act of 2006. Existing law requires certain procurement and contracts proposed by the WCI, Inc. to meet requirements that include, among others, notification to the Joint Legislative Budget Committee. The State Contract Act generally provides a contracting process for state agencies and exempts specific state entities from its provisions relating to contracts for the acquisition of information technology goods and services. This bill would exempt the Western Climate Initiative, Incorporated from provisions of the State Contract Act relating to the acquisition of information technology goods and services and consider a certain type of contract with WCI, Inc. as a membership agreement. Existing law establishes various incentive programs that are administered or funded by the State Air Resources Board to provide financial assistance for the purchase of vehicles by individuals and fleet purchasers. This bill would, with funds provided in the 2026 Budget Act, require the state board to establish a new zero-emission electric vehicle incentive program for first-time zero-emission vehicle buyers and, as part of that program, to enter into grant agreements with light-duty passenger vehicle original engine manufacturers to provide incentives for consumers for the purchase or lease of new, and the purchase of used, light-duty passenger electric vehicles at the point of sale and registered to California residents. This bill would make these provisions inoperative on September 1, 2031, and would repeal them as of January 1, 2032. Existing law establishes the Continuation Account in the Wildfire Fund, to be administered by the Wildfire Fund Administrator, and continuously appropriates moneys in the account for purposes of payment of eligible claims arising from wildfires ignited on or after September 19, 2025, as provided. Existing law requires each large electrical corporation to provide to the Public Utilities Commission (PUC) a written notification of its election to participate, or not to participate, in the account, and requires the PUC, if all participating electrical corporations have provided their election to participate in the account, to provide the administrator and other entities notification of their elections. Existing law authorizes the administrator, on or after the date the PUC provides that notification, but not later than December 31, 2028, to determine if additional annual contributions from large electrical corporations are needed to enable the account to fund the timely payment of eligible claims, as provided. Existing law requires the PUC, within 15 days of receiving notification from the administrator that additional annual contributions are required, to initiate a rulemaking proceeding to consider using its authority to require the large electrical corporations to collect a nonbypassable charge from ratepayers to support the account, as provided. If the PUC imposes the nonbypassable charge to support the account, existing law requires the large electrical corporations, from calendar years 2029 to 2045, inclusive, to provide to the administrator their annual contributions, as specified, for deposit into the account. This bill would instead authorize the administrator, on or after the date the PUC provides that notification, but not later than December 31, 2028, to determine if those annual contributions, instead of the additional annual contributions, are needed. The bill would make additional technical and conforming changes. Existing law requires the PUC to prohibit a large electrical corporation from including in its equity rate base its share, as determined pursuant to a specific allocation metric, of the first $6,000,000,000 expended in aggregate by large electrical corporations on fire risk mitigation capital expenditures approved by the commission on or after January 1, 2026. This bill would modify the allocation to be used for purposes of the above-described prohibition. Existing law requires the Energy Commission to implement and administer the Distributed Electricity Backup Assets Program to incentivize the construction of cleaner and more efficient distributed energy assets that would serve as on-call emergency supply or load reduction for the state's electrical grid during extreme events, and the Demand Side Grid Support Program to incentivize dispatchable customer load reduction and backup generation operation as on-call emergency supply and load reduction for the state's electrical grid during extreme events, as provided. Existing law, the Budget Act of 2021, appropriates $495,000,000 from the General Fund to the Energy Commission to support the implementation of the Distributed Electricity Backup Assets Program and provides that this amount is available for encumbrance or expenditure by the Energy Commission until June 30, 2026, and for liquidation until June 30, 2030. Existing law, the Budget Act of 2024, reverts $308,700,000 of that amount to the General Fund. This bill would specify that the moneys appropriated in the Budget Act of 2021 to support the implementation of the Distributed Electricity Backup Assets Program is also available to be used for the Demand Side Grid Support Program, thereby making an appropriation. The bill would make that appropriation available for encumbrance or expenditure until June 30, 2027. Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime. Because certain of the above-described provisions would be part of the act and a violation of a PUC action implementing the above-described provisions would be a crime, this bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason. This bill would declare that it is to take effect immediately as a bill providing for appropriations related to the Budget Bill.
-
S 4162 — New Jersey
"Affordable Power Purchase Agreements Extension Act"; concerns extension of certain public entity contracts related to energy conservation and renewable energy production.
-
SB 1092 — North Carolina
2026 Senate and House Appointments.
-
BDR 324 — Nevada
Revises provisions relating to energy.
-
BDR 306 — Nevada
Revises provisions governing electric bicycles.
-
BDR 58-278 — Nevada
Revises provisions relating to energy.
-
BDR 270 — Nevada
Revises provisions relating to energy.
-
A 11645 — New York
Enacts the "just energy transition act"
Enacts the "just energy transition act"; requires a study of competitive options to facilitate the phase-out, replacement and redevelopment of New York state's oldest and most-polluting fossil fueled generation facilities and their sites by the year 2030.
-
HB 348 — Delaware
AN ACT TO AMEND TITLE 29 OF THE DELAWARE CODE RELATING TO ELECTRIC VEHICLES.
This Act updates the electric vehicle rebate program administered by the Department of Natural Resources and Environmental Control in light of changes to federal policies and market forces affecting electric vehicle deployment. The bill provides the Department with additional flexibility to set rebate amounts and improve programmatic offerings. The bill also allows enhanced rebates for an eventual program targeting lower income families.
-
SB 308 — Delaware
AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO THE LOAD FORECAST ACCOUNTABILITY ACT.
This legislation shall be known and may be cited as the “Load Forecast Accountability Act.” Recent reports by PJM Interconnection, L.L.C. (PJM), have highlighted that electricity demand across the PJM footprint, including Delaware, is projected to grow due to data centers, electrification of vehicles and buildings, and other large load additions. PJM recently projected that, by 2030, PJM expects to add 32 GW of load to the grid – 30 GW of which is attributable to data centers. PJM relies upon load forecasts submitted by Commission-regulated electric distribution companies in Delaware to establish system planning needs and capacity requirements which ultimately have costs associated with both. Accurate, transparent, load forecasting is essential to ensure the adequacy of electric supply, maintain system reliability, and protect Delaware consumers from unnecessary costs caused by overbuilding or underbuilding system resources. There is a critical need for the Delaware Public Service Commission to provide oversight of load forecasting inputs from Commission-regulated electric distribution companies, to ensure accuracy and transparency, and to coordinate with PJM and neighboring state regulators to prevent duplicative counting of projects and customer contracts. The purpose of this Act is to provide the Commission with authority and responsibility to: (1) Review and evaluate load forecasts submitted by Delaware Commission-regulated electric distribution companies to PJM; (2) Coordinate with PJM and other states to ensure accurate system-wide planning; and (3) Access all relevant materials, including confidential agreements, necessary to carry out this oversight. Under this Act, the Commission is required to submit a written report to the Governor, the General Assembly, and the Director and the Librarian of the Division of Legislative Services no later than May 1 of each year on its progress in implementing this Act. This report must also be posted on the Commission’s website.
-
A 4375 — New Jersey
Specifies electric vehicle parking space calculation is rounded up if it includes fraction of a whole number and rounded-up parking spaces cannot reduce overall parking supply by more than 10 percent.
-
HB 563 — Virginia
Personal property taxation; establishes classification for major energy consumer equipment upgrades.
Personal property taxation; classifications; major energy consumer equipment upgrades. Establishes a special classification for generating equipment purchased on and after July 1, 2026, for the purpose of upgrading the backup or standby power systems of a major energy consumer (i) from equipment that does not meet Tier 2 emission standards to selective catalytic reduction generators that meet or exceed Tier 4 emission standards or (ii) to meet New Source Performance Standards as enforced by the Department of Environmental Quality, as applicable. The bill provides that such equipment may be taxed at a lower rate than is applied to other tangible personal property.
-
HB 420 — Virginia
Public utilities; reopening rate case in certain instances.
Public utilities; reopening rate case in certain instances. Provides that if an application is filed with the State Corporation Commission for approval of the acquisition or disposition of control involving a public utility and such application is filed within 24 months after the entry of a final order in a rate increase proceeding, the Commission may, on its own initiative or upon petition of any interested person, reopen such rate increase proceeding.
-
SB 509 — Virginia
Licensed suppliers of electric energy; aggregate demands, total retail load limit.
Electric utilities; licensed suppliers of electric energy; aggregate demands; total retail load limit. Amends provisions that permit two or more individual nonresidential retail customers of electric energy to petition the State Corporation Commission (the Commission) to aggregate their electric demands for the purpose of purchasing electric energy from a licensed supplier. Under the bill, the five megawatt participation threshold is based on noncoincident peak demand in calendar year 2024 and any year thereafter. Under the bill, such customers are not required to petition the Commission for approval to aggregate their demands, but are required to notify the Commission and incumbent electric utility in writing that they have met the requirements for doing so. The bill makes it voluntary rather than mandatory for the Commission to impose certain periodic monitoring and reporting obligations for such customers to demonstrate continued compliance with the aggregate demand limitations.
-
SB 466 — Virginia
Electric utilities; cost recovery, costs substantially related to serving data center customers.
Electric utilities; electric distribution infrastructure serving data centers. Prohibits the costs associated with the construction or extension of any electric distribution infrastructure that primarily serves the load of a data center, including the costs of any associated land acquisition, from being recovered from any other customer.
-
HB 1409 — Virginia
Virginia Residential Landlord and Tenant Act; prohibited provisions in rental agreements.
Virginia Residential Landlord and Tenant Act; prohibited provisions in rental agreements; landlord's maintenance responsibilities. Prohibits a rental agreement from containing any provision stating that the tenant agrees to pay (i) any fee for the maintenance of the premises, including the maintenance or provision of heating and cooling systems, pest control, trash disposal, common area utilities, and mail or package delivery; (ii) a fee for internet, cable, or any other utilities or services that amount to more than the cost paid by the landlord; or (iii) for the maintenance or security of the common areas. The bill also repeals the provision allowing the landlord and tenant to agree in writing that the tenant may perform certain duties typically assigned to the landlord and also specified repairs, maintenance tasks, alterations, and remodeling, but only if the transaction is entered into in good faith and not for the purpose of evading the obligations of the landlord and if the agreement does not diminish or affect the obligation of the landlord to other tenants in the premises.
-
SB 503 — Virginia
Phase II Utility; rates, terms, and conditions of services, certain customers.
Phase II Utility; rates, terms, and conditions of services; certain customers. Requires Dominion Energy Virginia to establish rates, terms, and conditions for the provision of generation and distribution services for its customers within the GS-5 rate class, as established by final order of the State Corporation Commission, that require each such customer to pay a minimum generation charge equal to 100 percent of such customers' contracted electric demand.
-
SB 415 — Virginia
Va. Brownfield & Coal Mine Renewable Energy Grant Fund; increases kilowatt of nameplate capacity.
Virginia Brownfield and Coal Mine Renewable Energy Grant Fund. Increases from $100 per kilowatt of nameplate capacity from renewable energy sources that are located on brownfields to $200 per kilowatt of nameplate capacity from renewable energy sources that are located on brownfields the grant amount a project developer can receive from the Virginia Brownfield and Coal Mine Renewable Energy Grant Fund. This bill is a recommendation of the Commission on Electric Utility Regulation.
-
HB 591 — Virginia
Data centers; policy of the Commonwealth.
Policy of the Commonwealth; data centers. Provides that it is the policy of the Commonwealth to encourage the responsible operation of data centers in the Commonwealth while supporting grid reliability, affordability, and the deployment of renewable resources. The bill provides that in furtherance of this policy, the Commonwealth shall (i) promote coordination between data centers, state agencies, and regional grid operators to share information on energy usage, interconnection timelines, and barriers to rapid deployment of renewable and flexible energy resources; (ii) incentivize data centers to participate in demand response programs, implement energy storage and management systems, and leverage automated technologies to reduce peak demand and support grid stability; (iii) encourage flexible energy practices that allow data centers to adjust energy consumption in real time in alignment with available renewable generation; (iv) ensure large-scale data centers pay their fair share of infrastructure investments, mitigating impacts on residential and small business ratepayers; (v) require data centers to report water and aggregated energy usage, sustainability measures, and participation in grid support programs to appropriate state and federal agencies; and (vi) promote cybersecurity, physical security, and supply chain security measures to protect Virginia data center operations from foreign adversary access or compromise.
-
SB 510 — Virginia
Virginia Clean Energy Research and Support Center; established, report.
Virginia Clean Energy Research and Support Center; established. Establishes the Virginia Clean Energy Research and Support Center (the Center) as an interdisciplinary study, research, and informational resource for individuals and businesses in the Commonwealth. The Center is governed by a board of directors that includes representatives from several colleges and universities in the Commonwealth, the Department of Energy, the Department of Environmental Quality, and the Commission on Electric Utility Regulation. The board is directed to establish an advisory council to provide expertise and guidance related to the functions and duties of the Center. Functions and duties of the Center include providing technical assistance in matters related to energy technologies, siting, permitting, project design, interconnection, electric infrastructure, electric utilities, ratepayer proceedings, and environmental impacts of energy projects. Under the bill, the Center shall conduct an annual evaluation and collaborate with state agencies and institutions of higher education to provide technical assistance, research, or support in matters related to siting and permitting, programs to improve electric grid reliability, energy programs established at a participating institution of higher education, and administration and implementation of the Virginia Energy Plan. The bill also requires the Center to submit an annual report to the Commission on Electric Utility Regulation summarizing its research activities and any funding received by the Center by November 1 of each year.This bill is a recommendation of the Commission on Electric Utility Regulation.
-
HB 324 — Virginia
Electric Vehicle Rural Infrastructure Program and Fund; established and created.
Electric Vehicle Rural Infrastructure Program and Fund created. Creates the Electric Vehicle Rural Infrastructure Program and Fund to assist private developers with non-utility costs associated with the installation of electric vehicle charging stations (i) in certain localities; (ii) on eligible public land, as defined in the bill; or (iii) within one mile of the boundary of eligible public land. The bill provides that a private developer may apply for a grant in an amount equal to 70 percent of the private developer's non-utility costs for the installation of such public electric vehicle charging stations. The awarding of a grant under the Program is conditional upon an agreement with the applicant that any cost of a project not funded by a grant awarded by the Program be funded by non-federal funds. The bill directs the Department of Energy to establish guidelines for the administration of the Program, including guidelines related to the application for and award of grants. The bill has an expiration date of July 1, 2031.
-
HB 1372 — Virginia
Solar energy facilities; prevailing wage & apprenticeship requirements, state & local tax exemption.
Solar energy facilities; prevailing wage and apprenticeship requirements; state and local tax exemption; report; civil penalties. Requires each solar developer, including its contractors and subcontractors, to ensure payment at the prevailing wage rate set by the Department of Labor and Industry for any mechanic, laborer, or worker employed, retained, or otherwise hired to perform construction, maintenance, or repair work for certain electricity generating sources. The bill requires each solar developer to (i) ensure that a percentage of the total labor hours of such work is performed by qualified apprentices and (ii) employ at least one qualified apprentice if four or more individuals are employed to perform such work. Under the bill, a solar developer that fails to meet the requirements of its provisions is required to make penalty payments to the Commissioner of Labor and Industry. Additionally, the bill provides that any certified solar generation facility, as defined in the bill, is declared a separate class of property and shall be classified for local taxation separately from other classifications of real or personal property. Such facilities shall be wholly exempt from state and local taxation under the Constitution of Virginia.
-
HB 661 — Virginia
Traffic reg.; bicycles, electric personal assistive mobility devices, etc., yielding at stop signs.
Traffic regulation; bicycles, electric personal assistive mobility devices, electric power-assisted bicycles, and motorized skateboards or scooters. Authorizes any person operating a bicycle, electric personal assistive mobility device, electric power-assisted bicycle, or motorized skateboard or scooter to yield instead of stop at an intersection controlled by a stop sign if certain conditions are met. The bill also authorizes such a person to proceed through the intersection on a steady red light if the pedestrian control signal corresponding to the person's direction of travel and to the parallel crosswalk indicates "Walk" and if certain other conditions are met. The bill requires any such persons riding two abreast on roadways with only one travel lane in the direction of such persons and a posted speed limit of 35 miles per hour or more to not impede the normal and reasonable movement of traffic. Under current law, such persons riding two abreast are required to not impede the normal and reasonable movement of traffic and are required to move into a single-file formation when being overtaken from the rear by a faster moving vehicle, regardless of the type of road and posted speed limit.
-
HB 1379 — Virginia
Electric utilities; interconnection service standards, high-demand customers.
Electric utilities; interconnection service standards; high-demand customers. Requires the State Corporation Commission to establish standards for interconnection service by an electric utility to high-demand customers, as defined in the bill, in the Commonwealth that are designed to support economic growth in the Commonwealth while maintaining the reliability of the electric grid and minimizing the potential for stranded infrastructure costs.
-
HB 314 — Virginia
Uniform Statewide Building Code; homeowners who live off grid.
Board of Housing and Community Development; Uniform Statewide Building Code; homeowners who live off grid. Directs the Board of Housing and Community Development to amend the Uniform Statewide Building Code to exempt any homeowner who lives off the electrical grid from complying with provisions of the Building Code regarding electrical systems, so long as his home is otherwise habitable pursuant to Building Code regulations.
-
SB 751 — Virginia
Utility Facilities Act; definition of public utility.
Utility Facilities Act; definition of public utility. Provides that for the purposes of the Utility Facilities Act, the term "public utility" does not include any company that owns or operates one or more facilities for the generation, distribution, or storage of electric energy exclusively for consumption by one or more customers located on the site of such facilities or on adjoining property, provided that such facilities are connected on the customer's side of the electric meter and electricity is delivered without the use of a public utility's distribution or transmission system. The bill also provides that after such a facility operates within the certificated service territory of an electric utility for a duration of five years, such company is required to submit to such public utility a written offer for the sale of such facility.